NRP PC1 - Guide to making a submission
NRP PC1 - Guide to making a submission
Farrant 2023. Tech memo - Minimum stormwater contaminant treatment requirements for new urban development and redevelopment – PC1 NRP
Farrant 2023. Tech memo - Minimum stormwater contaminant treatment requirements for new urban development and redevelopment – PC1 NRP
Easton, Nation and Blyth 2023. Erosion risk mapping for TAoP Whaitua and Whaitua TWT
Greer, M.J.C. 2023b. Assessment of alignment between the regulatory provisions and target attribute states in proposed Plan Change 1 to the Natural Resources Plan – Te Awarua-o-Porirua Whaitua
Form 5 - GWRC Plan Change 1 to the Natural Resources Plan Change
Proposed Plan Change 1 Section 32 report
Proposed Plan Change 1 document as notified on 30 October 2023
Thompson, M.J. 2023. Plan Change 1 – Te Awarua o Porirua, Water quantity and allocation technical report