Link to report prepared in July 2015 for GWRC by LWP as part of the draft Natural Resources Plan process
This technical note documents the validation of the Wellington Transport Strategy Model (WTSM) as part of the 2013 update of the model.
This paper looks at the value of pursuing flood protection options that are flexible, rather than adopting a single solution that cannot be adapted to deal with changing and unpredictable external…
This technical note documents the validation of the Wellington Transport Strategy Model (WTSM) as part of the 2013 update of the model. The validation process ensures that the WTSM is…
This document provides guidance on the floodplain management planning process, and on the preparation and production of Floodplain Management Plans. The purposes of the guidelines are to apply consistent principles…